Keep the dirt on your side of the curb
Silt Fence, Wattles & Inlet Protection in Portland, OR
Sediment control installed before the first scoop of dirt moves and kept working until the site is stabilized.
- No-cost site visit, then a quote in writing
- Seeding planned around the Willamette Valley rain calendar
- Silt fence and stabilization installed to your approved erosion plan

Stopping Soil Before It Reaches the Street
Silt fence, wattles and inlet protection are the first things that go in on most Portland construction sites, and among the last to come out. Portland's erosion control rules prohibit visible or measurable sediment leaving a site or entering the public right-of-way, and prohibit washing soil into the storm sewer or any water body. We are silt fence contractors for builders, remodelers, utility crews and homeowners with permitted projects, handling silt fence installation, wattles, inlet protection and maintenance through the rainy season.
Installed before ground disturbance
The city requires sediment controls to be in place and working before ground-disturbing activity starts, and for on-property development permits a pre-construction erosion control inspection has to be approved before digging begins. We install to the approved plan ahead of that inspection so your excavator is not waiting on a fence.
Silt fence done properly
Silt fence only works if the bottom edge is trenched in and backfilled, the posts are on the downhill side of the fabric, and the fence follows the contour so water ponds behind it instead of running along it to a low corner. The ends are turned uphill so runoff cannot slip around. On steeper ground or where heavier loads are expected, we use stabilized or wire-backed fence. A fence lying flat in the mud is not sediment control, and inspectors know it.
Wattles where fence does not fit
On tight urban lots, along sidewalks, on paved areas and across slopes, straw wattles often work better than fence. They can be staked in soil or weighted on hard surfaces, and they work well as slope breaks. Many small Portland infill jobs use a mix of both.
Inlet protection
Storm inlets that are working during construction have to be protected under the city's rules. Depending on the inlet type and traffic, that may be a filter insert under the grate, a ring of wattles or gravel bags around an area drain, or a silt fence barrier around a field inlet. Curb inlets on busy streets need protection that does not create a traffic or flooding hazard, so we pick the device for the location.
Maintenance through the season
The city expects the erosion and sediment control manager to inspect controls weekly from October 1 to April 30, monthly from May 1 to September 30, and within 24 hours of any rain over half an inch in 24 hours. We can handle the repairs those inspections turn up: cleaning out sediment behind fence, resetting wattles, replacing torn fabric and clearing clogged inlet filters. At the end, after final stabilization, temporary controls have to be removed and disposed of, and we do that too.
Sediment control on small jobs
Even work that needs no permit, such as a homeowner's regrade or a landscaping project, still has to keep sediment out of the street and storm drains. A short run of wattles and an inlet filter costs little next to a cleanup notice.
Pricing
Silt fence and inlet protection rows in the table are taken from a DOT unit-rate sheet (2025). Once you sign off on our written figure, that number holds for the job as described. Get a free estimate
Sediment Control Work
Perimeter, inlet and maintenance work for permitted and unpermitted jobs.
Silt fence installation
Trenched, staked fabric fence along the downhill perimeter, standard or stabilized.
Straw wattles
Staked or weighted sediment rolls for tight lots, slopes and paved edges.
Inlet protection
Inserts, gravel bags, wattles or fence barriers sized to the inlet and traffic.
Stockpile protection
Cover and perimeter control for soil piles the code says must be secured.
Maintenance and repairs
Sediment cleanout, fabric replacement and resets after storms.
Removal at project end
Temporary controls pulled and disposed of after permanent cover is established.

Reference Prices for Sediment Control
| Item | Published figure |
|---|---|
| DOT unit-rate sheet (2025): silt fence without stabilization, 100 linear ft | $378 |
| Same sheet: silt fence with stabilization, 100 linear ft | $748 |
| Same sheet: silt fence ring around one storm inlet | $102 |
| Same sheet: sandbag protection at one storm inlet | $141 |
| Same sheet: gravel-and-mesh protection at one storm inlet | $172 |
These are agency reference rates, not Portland quotes. Footage, ground conditions, access and how long controls must be maintained all shift the total. Ballpark only. A written, itemized number follows the site visit.
Install to Removal
1. Read the plan
We confirm fence lines, inlet locations and device types against the approved erosion plan.
2. Install before digging
Fence, wattles and inlet protection go in ahead of the pre-construction inspection.
3. Maintain
Repairs and sediment cleanout after storms or on your manager's inspection list.
4. Seed and remove
Once disturbed ground is covered, we pull and dispose of temporary controls.

Why Choose Us for Silt Fence, Wattles & Inlet Protection
Ready for inspection
We install what the plan shows, where it shows it, before the excavator arrives.
Seed and fence from one crew
The same crew that sets the fence can stabilize the ground that lets you remove it.
Storm follow-up
After big rain events we can check and repair controls so problems do not pile up.
Silt Fence, Wattles & Inlet Protection Questions
Does my project in Portland need silt fence?
If it has a development permit with ground disturbance, the approved erosion plan says what controls you need. Even without a permit, sediment cannot leave the site or enter storm drains, so a barrier on the downhill side is usually wise.
Silt fence or wattles?
Silt fence suits open perimeter runs in soil. Wattles fit tight lots, paved edges and slopes. Many sites use both.
Once the lot is seeded, when can the Portland silt fence come out?
Until permanent stabilization is established. On permitted work, the final erosion inspection checks that permanent cover is working and temporary controls are removed.
Who maintains it during the job?
The site's erosion and sediment control manager is responsible for inspections. We can do the repairs and cleanouts those inspections call for.

Silt Fence, Wattles & Inlet Protection Service Areas
- Hydroseeding in Portland, OR
- Hydroseeding in Gresham, OR
- Hydroseeding in Hillsboro, OR
- Hydroseeding in Beaverton, OR
- Hydroseeding in Happy Valley, OR
- Hydroseeding in Tigard, OR
- Hydroseeding in Lake Oswego, OR
- Hydroseeding in West Linn, OR
- Hydroseeding in Oregon City, OR
- Hydroseeding in Tualatin, OR
- Hydroseeding in Sherwood, OR
- Hydroseeding in Wilsonville, OR
- Hydroseeding in Milwaukie, OR
- Hydroseeding in Troutdale, OR
- Hydroseeding in Fairview, OR
- Hydroseeding in Camas, WA
- Hydroseeding in Washougal, WA
- Hydroseeding in Battle Ground, WA
- Hydroseeding in Ridgefield, WA
- Hydroseeding in Vancouver, WA
- Hydroseeding in Canby, OR
- Hydroseeding in Forest Grove, OR
- Hydroseeding in Cornelius, OR
- Hydroseeding in Sandy, OR
Get a Silt Fence, Wattles & Inlet Protection Estimate
Sediment control installed before your dig date.